Turbine - Generator (TG) Units & Auxiliaries
Year
  Descriptions
  Client

1984

OVERHAULING OF TURBINE GEN, UNITS - 3 100 MW - BADARPUR T.P.S. (DELHI)

B.H.E.L
1985 REPLECEMENT OF STATOR OF 100MW TG UNIT - 2, BADARPUR T.P.S. (DELHI) B.H.E.L
1987 MAJOR O/H OF 110 MW TURBINE - GEN. UNIT - 3 AT GNDTP - BHATINDA (PUNJAB) P.S.E.B
1988

MAJOR O/H OF 110 MW TURBINE - GEN, UNIT - 1 GNDTP - BHATINDA (PUNJAB)

P.S.E.B
1988

ANNUAL O/H OF HP, LP, IP TURBING & AUXILIARIES OF 210 MW UNIT ROPAR T.P.S. (PUNJAB)

P.S.E.B
1990

ANNUAL O/H OF UNIT - 1 & 11 OF 210 MW (K.W.U DESIGN TURBINE - GENERATOR) ROPAR T.P.S. (PUNJAB)

P.S.E.B
1991

ANNUAL O/H OF TG UNIT - III & IV OF 210 MW ( K.W.U - DESIGN) ROPAR T.P.S (PUNJAB)

P.S.E.B
1991

REPLACEMENT OF GEN, STATOR OF - UNIT - IV & GEN, ROTOR THREAD IN AND OUT OF UNIT - III ROPAR T. P.S (PUNJAB)

P.S.E.B
1991

ANNUAL OVERHAULING OF TG UNIT - I & IV OF 210 MW (K.W.U - DESIGN.) ROPAR T.P.S. (PUNJAB)

P.S.E.B
1994

OVERHAULING OF TG UNIT -I, 210 MW FGU TPP, UNCHAHAR T.P.S (UP)

B.H.E.L
1994 OVERHAULING OF 210 MW UNIT - III, GANDHI NAGAR T.P.S (GUJRAT) B.H.E.L
1994

REPLACEMENT OF HP HEATER NO.5, UNIT-3, 210 MW KOTA T.P.S (RAJASTHAN)

M.P.E.B
1994 OVERHAULING OF STEAM / FEED LINE VALVES & TG AUX., HEAT EXCHANGER, 6.6 KV MOTORS & MISC. WORK OF UNIT-6, SATPURA THERMAL POWER STATION SARNI (MP) B.H.E.L
1996

O/H OF MODULES & GENERATOR UNIT-3, 210 MW KOTA T.P.S. ((RAJASTHAN)

B.H.E.L
1996

RETUBING OF CONDENCER OF 100 MW, UNIT-3 BADARPUR T.P.S. (DELHI)

B.H.E.L
1998

GENERAL ELECTRICAL WORK FOR UNIT-V 210 MW GGSSTP ROPAR (PUNJAB)

B.H.E.L
1998

DISMANTLING, REASSEMBLY, TESTING & COMMISSIONING OF TG UNIT - LEHRA MOHABBAT BHATINDA (PUNJAB)

B.H.E.L
1998 RE-TUBING OF CONDENSER OF 100MW UNIT - 11, BADARPUR T.P.S. (DELHI) B.H.E.L
1998

RETUBING OF CONDENSER, 210 MW UNIT - 4, BADARPUR T.P.S. (DELHI)

B.H.E.L
1999

GENERATOR ELECTRICAL WORK OF UNIT - 111 GGSSTP - ROPAR (PUNJAB)

B.H.E.L
1999

THREADING OUT OF GEN, ROTOR & REPLACEMENT OF CC BOLTS UNITS - 5, PANIPAT T.P.S.((HARYANA)

B.H.E.L
1999

GENERATOR ELECTRICAL WORK UNIT - IV, 210 MW GGSSTP - ROPAR (PUNJAB)

B.H.E.L
2000

O/H OF TURBINE GENERATOR & AUXILIARIES OF UNIT - 5, 210 MW PANIPAT T.P.S. (HARYANA)

B.H.E.L
2000 GENERATOR MECHANICAL WORK & REPLACEMENT OF CC BOLTS OF UNIT - 1, 210 MW. GHTP LEHRA MOHABAT (PUNJAB) B.H.E.L
2001 IDENTIFICATION OF FAULTY STOTOR BARS & GENERATOR, MECHANICAL WORK UNIT - 5, 210MW PANIPAT T.P.S.((HARYANA) P.S.E.B
H.T & L.T MOTORS
Year
  Descriptions
  Client

1989

ANNUAL O/H OF 55 NOS. HT & 72 NO. LT. MOTORS OF UNIT - 1 &11 OF 210 MW ROPAR T.P.S. (PUNJAB)

P.S.E.B
1989 GENERAL MTC. OF HT. MOTORS INSTALLED IN UNIT - 1, 2, 3, & 4 OF 210 MW UNIT OF ROPAR T.P.S. (PUNJAB) P.S.E.B
1992 O/H OF 6.6 KV MOTORS UNIT - III, IV 210 MW ROPAR T.P.S. (PUNJAB) P.S.E.B
1993

OVERHAULING OF 6,6 KV MOTORS ROPAR T.P.S. (PUNJAB)

P.S.E.B
1995

O/H OF 6,6 KV & L. T. MOTORS OF UNIT - III, IV, VI, CHP, AREA ROPAR T.P.S. (PUNJAB)

P.S.E.B
1998

OVERHAULING OF 6,6 KV MOTORS & LT MOTORS OF UNITS - 2, 3 & 5 ROPAR T.P.S. (PUNJAB)

P.S.E.B
1999

OVERHAULING OF 6,6 KV MOTORS & L.T. MOTORS ROPAR T.P.S. (PUNJAB)

P.S.E.B
2000

OVERHAULING OF 16 NO. H. T. MOTORS (PACKAGE - 1) OF 210 MW, UNIT - 5, PANIPAT T.P.S. (HARYANA)

H.P.G.C.L
2000

OVERHAULING OF 176 NO, L.T. MOTORS OF 210 MW, UNITS - 5. PANIPAT T.P.S. (HARYANA)

H.P.G.C.L
2001

OVERHAULING OF 6.6 KV MOTORS & L.T.D MOTORS OF UNITS - 1 TO 6 & CHP. ROPAR T.P.S.((PUNJAB)

P.S.E.B
HYDO ELECTRIC POWER PLANT
Operation and maintenance of Micro Hydro Plants since 1999 till date from PEDA Erection works at Nathpa Jhakri Hydroelectric Project of 6 X 250 MW. Himachal Pardesh. Erection work of more than 2000 MT. (Hydro-Mechanical work) through GE UK Overhauling of Hydroelectric Power station at Shanan in Himachal Pardesh through BHEL Repair work at Pathankot Hydro Electric plant in Punjab from BHEL
BACK
BHEL is the largest engineering and manufacturing enterprise in India in the energy-related/infrastructure sector, today. BHEL was established more than 40 years ago, ushering in the indigenous Heavy Electrical Equipment industry in India...
Read more
NTPC, India's largest power company, was set up in 1975 to accelerate power development in India. Today, it has emerged as an ‘Integrated Power Major’, with a significant presence in the entire value chain of power generation business.
Read more
The Punjab State Electricity Board(PSEB) is a statutory body formed on 1-2-1959 under the Electricity Supply Act.1948. Subsequently with the re-organization of the erstwhile State of Punjab under the Punjab Re-organization Act 1966 the present form came into existence w.e.f. 1st May,1967.
Read more